This massive 650kW commercial solar system installed by others ran into some damage. Engineer’s alongside Energy Rich were engaged to perform the rectification works. A detailed proposal was supplied to the college. Scope of works included detailed fault simulation, DC surge protection on each of the twenty inverters, fuses, communication isolation and surge protection from field equipment back to network, segregation of server racks, new ethernet connection and cable runs, providing as built drawings and mapping of this large Solar Edge system. Many technical challenges have presented and been resolved on this project with the aide of the IT, Engineers and Energy Rich’s team of trade and technical minds.